Upgrade of Ghosts
I often pre-place items for planning purposes, but these are early tier even for late game buildings.
It would be nice if ghosts could be upgraded to higher tier buildings, such as for the assembler to go from Manual => Electric => Electric II without having to either build it first, or remove and replace.
Comments: 5
-
21 Jun, '22
YandersenDon't be so fast popping up suggestions without second thought. What if the ghost has some product delivered already before u hit the upgrade for it? A mess, complications, a bug-prone mechanic. Not worth it.
-
08 Jul, '22
Mal MergedIf the footprint matches, make a planned objects up-gradable before building -- so the planned object changes to the upgraded version.
This would be most helpful when laying out planned pipes and conveyors and realizing an upgraded version of the them is required.
The current system demands the current transport layout is destroyed and the upgraded version is laid all over again. -
13 Jul, '22
Freqvency MergedThis would be very nice, especially for transports while planning the build.
Also downgrading while planning would be nice. -
13 Jul, '22
FreqvencyYou could handle it like deconstruction and immediate construction after the delivered products got removed.
-
31 Aug, '22
Captain Zuff Admin"Planned Buildings, Pipes, Conveyors Instant Upgrade Before Build" (suggested by Mal on 2022-07-08), including upvotes (7) and comments (1), was merged into this suggestion.