Custum Bridges
That can go over water and pipe and conveyor bridges
Comments: 1
-
12 Jul, '24
GrandFormageBridge construction should be available early and in two (research) components... The Ramp(s) (could be used to span cliff levels) and The Span [segment(s)] with a fixed height(s). First option\version would be made of "Wood & Brick", and rather small.
2
The first researchable improvement should be before the Level One Lab, modifying materials used; "Iron & Concrete Slab".
The next level of research would add to span length (number of span segments, possibly 2, 3, 4... [3+] would require additional research, "Concrete Pillar\Retaining Walls").
Once Steel has been researched, the ability for custom length\bridges, and the ability to span over water (between two islands or or over a custom made waterway) becomes available. "Concrete Pillar" will be needed for spanning water due to the potential bridge length (number of span segments) and waterway depths (greater than two levels). Greater depths will require more resources.
Maintenance is required, not to exceed Level Two (yellow).